Backpack Components Inspection

Backpack Components Inspection
Katmandu Nepal Asia
Tuesday, January 9, 2007

I am drawing the various component parts of my backpack design daily. After completion, I than go to the internet café, publish to paper, and then go to the factory to show the master cutter.. I am not sure they understand them, the words are in English and not Nepali, yet there is idea that they now have been told. What the real success is I have slowed them down enough to focus on one component and not trying to think of the whole.

I go to the factory now at 11:00 AM, and then return between 3:00 and 5:00 pm to check. Today it will be at 3:00 because they turn off the electricity in this part of Katmandu from 4:00 to 7:30 pm.

I am trying to learn how to deal with overseas companies who speak a different language. It for sure would be easier if I would make the sample in the USA, and then bring here. Everything about manufacturing backpack has to do with the availability of fabrics, clips, and parts needed to make the bags.

This one component discussion and not the complete bag is windfall advancement in methodology. I am in a constant dilemma on how to control the quality and design.

Daily making and inspection of only one component solves the language problem. When they proceed fast, the number of misunderstanding is tripled.

I guess to plan, I need to think, one component, one day, therefore I need to count the number of parts, and add a few days for backup.

Backpack Components Inspection

Comments